Panama City

Estación San Gabriel

Total renovation of a station in the middle of the city: demolition of the old station, removal of the existing steel tanks, and complete construction of the new station. All on an urban lot boxed in by buildings, with demolition, disposal and construction logistics in a tight space.

Scope of work

  • Demolition of the existing station
  • Extraction and disposal of the old steel tanks
  • Excavation, walls and new lined tank pit
  • Installation of new tanks
  • Assembly of new canopy and dispenser islands

Result

Station fully demolished and rebuilt

On site

The work in photos

Field record of the intervention, as it was executed.

Demolition of the existing station
Old steel tanks exposed
Old steel tank removal
Disposal of the removed tank
Excavation on a tight urban lot
Formwork and new walls
Concrete pour by pump truck
New lined tank pit
New tank installation
New canopy assembly
New dispenser island
Rebuilt station in finishing stage

Planning a similar project?

Share these details so we can assess the scope. Timing and execution conditions are defined for each site.

Station construction
  • Location and condition of the existing installation.
  • Areas to be renewed and site access restrictions.
  • Existing equipment and available documentation.
Tell us about your project