Skip to content

Fuel stations · Panama · since 1978

Panama's fuel station specialist

MESA 2D testing, technical support for Fire Department procedures and E10 compatibility assessment. Fuel-station experience since 1978.

Two Master Services technicians in hard hats during installation of a PLASTEEL tank at a station in Panama
1978year founded

Trayectoria en Panamá

ES/EN

bilingual technical site

MESA 2-D

documented tightness method

BCBRP

identified inspection authority

Who we are

Who is Master Services?

Master Services is a Panamanian company founded in 1978 that builds and maintains fuel-station infrastructure. It performs tightness tests with the MESA 2D method and prepares supporting technical documentation for procedures before the Fire Department (DINASEPI). It also assesses equipment compatibility with ethanol blends by component, model and manufacturer documentation. The implementation planned for April 2026 is suspended and has no new active date as of September 4, 2026. Master Services is a member of the Petroleum Equipment Institute (PEI).

What we do

Maintenance and compliance for your station — from tanks to dispensers

From testing and documentation for Fire Department procedures to E10 compatibility assessment. Operational continuity depends on the scope, configuration and safety conditions of each intervention.

On site

Real work, not renders

Tanks, dispensers, and the field — this is what Master Services' work looks like at stations across Panama.

Tank lift and installation in Panama City
Diesel tank farm
Underground fuel tank installation
Pump inspection and calibration
On-site dispenser maintenance

How we do it

From evaluation to start-up, in phases

Four steps. We schedule the work to minimize operational impact while we certify, test, and maintain compliance.

  1. On-site evaluation

    Diagnosis of the station and equipment condition before any work begins.

    Dispensers, tanks and lines under inspection.

  2. MESA 2D tightness test

    A nonvolumetric method that applies a vacuum and analyzes acoustic signals and water ingress.

    The report records the test scope, conditions and result.

  3. Hermeticity certification (Fire Dept.)

    Technical testing and documentation for hydrocarbon inspection and certification before the Fire Department (DINASEPI).

    Legal framework: Law 10 of 2010 (Fire Department); technical basis NFPA 30/30A.

  4. Phased operation

    We phase the intervention to minimize impact on dispensing.

    Operational continuity as a goal of every plan.

Technical resources

Guides to understand the rules before any work on your station

Technical documentation on tightness, E10 ethanol, and compliance. What a maintenance manager needs to read before deciding.

Trusted by Master Services

  • Delta
  • Texaco
  • Puma
  • Terpel
  • Ultra
  • MIT
  • CLH
  • Autoridad del Canal de Panamá
ComplianceSNEPEINFPA 30/30AOSHAMember of the Petroleum Equipment Institute (PEI)

Does your station meet the standard?

Schedule an evaluation with a specialist who knows your station and Panama’s regulations.

Request an evaluation